I have a very large schedule with multiple mining locations and multiple potential filling/backfilling locations. The volume of schedulable source and destination blocks means that each run produces about 1Gb of various report files. These report files, however are duplicated in the results folder and the 3DEXPERIENCE folder under the results folder so each schedule will now produce about 2Gb of data.
I am about to run this with Isight to optimise over cashflow / carbon reduction / equipment sizing, so the potential number of runs is in the hundreds or thousands. Potentially I have enough space if the results files are not duplicated. Is there any way in which this duplication can be managed?