Does MineSched support control the ratio of waste material from one mining location to different fill locations (waste dump)

 

Hi Geovia,

I am seeking the possibility to control the ratio of waste material from one mining location to two fill locations by using MineSched, but still not get it done. The help document shows the fill location can only support the priority parameters while the stockpile can do this job. I also create two imagined stockpile to test the possibility, still can not run with errors pop-up.

Did anyone successfully done this before or it can be achieved by the other function of MineSched?