I’m expecting clarification regarding the Factory Flow Simulation process.

Scenario 1:
How can we simulate or feed the following activities into the simulation?

  1. Before starting production, machines should be switched on by the respective personnel.
  2. Material data preparation for production by the designated personnel.
  3. Logging into email to send the daily production plan.
  4. Machine cleaning by the respective operators.
  5. Material inspection and weighing before starting production.

Scenario 2:

  1. After the machining process, weighing the material and inspecting its quality.
  2. Switching off the machines after completing the machining operation and recording the data.

Can these types of real-time pre-production and post-production activities be simulated in Factory Flow Simulation?
If not, will their absence affect the manpower utilization statistics generated in the simulation report?