Factory Flow Scenario
The raw material starts at the input zone and flows to Machine 1. Machine 1 processes the material and sends the output to Machine 2.
Machine 2 begins processing and converts the input material into two separate parts, named R1 and R2. After processing, Machine 2 sends the first output, R1, to Machine 3 for further processing.