How can I get two shifts to work one after the other? Only the first shift is working. I have two resource pools with 8 mannequins each, one to operate in position 3 and the other in position 4. Only these two positions, considered two stations, each with its own resource zone. The first shift runs from 5:45 AM to 3:35 PM with a 1-hour break. The second shift starts at 3:45 PM and ends at 1:35 AM the following day, also with a 1-hour break. Even with all the resource allocation for each shift, only shift 1 seems to work, and shift 2 doesn't work immediately afterward. Is there any other configuration that needs to be done? How can I ensure both shifts work?