Hi,
I was looking at the Job Duration for Worker functionality in NC Machines, but wasn't able to simulate my desired behaviour.
My impression of this functionality is I can change the duration of a transform activity to be dependant on the number of workers available for the activity. I.e 1 worker, the activity takes 1 hour but with 2 workers it takes 30 minutes.
Attached is a video of my attempt on how to do it. Except my operation duration isn't changing, coould you please advise on if this functionality is able to simulate my desired behaviour and if so, how to?
Thank you.