We are using 3DExperince 2021x. We have created BOP with general operations. Product is attached to same with proper scope. One NC machine is added. In resource configuration of same NC machine after drag and drop of general operations into Product zone, when we are simulating each time Assembly is changing positions as per location of parts assembling in that station. Means each part along with assembly is coinciding with coordinate system of product zone. Even though we have untick the options in app options that not to change the position it is
