[EFS] total manufacturing time of a product

Hello community,

Is there an easy way to know the total manufacturing time of a product?

In my case, I have a product which enter the line and go through different Machines (Transform Operation). It means it change the product after every station (Transform Operation output). I would like to know the total manufacturing time of the product (from the input zone to the output zone). I tried to use the Critical Path Trace and export product tracking history but it was not really simple to compute the total time through the Excel files.

Do you have any recommandations or tips to help me?

Best regards

Guillaume Wolff