CONVEYOR WITH 2 WORKERS

Hey guys, it's me again.

In this case I need two operators to feed two machines from the same conveyor. The worker needs to take the closest part of the conveyor, not the first part of the line. I try to change some parameters, but the conveyor stops at some point or the worker just goes for a walk. Do you know if it is possible to do this in Factory Flow? I attach the model.

Thank you very much,

Lucas