1.question:Upon upgrading the Mbom and replacing it with the latest revision, the relationship with the process node scope was disconnected, resulting in the loss of materials assigned to the step.
2.I hope that after upgrading the Mbom, the materials assigned to the step will not be lost. Is there a systematic solution?