Hello!
Operation (in general) have two different type of times:
1. Time per piece (to do operation)
2. Setup time (prepare and take off technological equipment)
In DELMIA I could use operation with specific time mode (estimated time or analyzed time or ... so on).
I think, Estimated time (or another type) is Time per piece. But how or where attribute for Setup Time?
In case of one product or part:
Time = Time per piece + Setup time
In case of batch of products or parts:
Time = Setup time + Time per piece*N
where N - numbers of products or parts.
It is very critical when we analyze time for batch of products in Process Flow Simulation.