For example, we have machining part. In one station we do some work (General Operation and Remove Material Operation) and go to second staion to do some specific work, which I could not do in first station and sent it to another station (even outsourced). After this I go to first station again to continue work.
I can do this with different architectures:
Case1:
I create two systems and create Production Flow between operations (see attached picture)
In this case we do not have Production Flow between systems.
Case2:
I create three systems and create Production Flow between Systems (and inside between operations).
In this case we have to create two systems which is the same (ST1 see attached picture).
Which case should I use if I want to use this structure in balancing, factory flow simulation, process flow simulation and so on.
Maybe we have third case...
