Hello,
I’ve seen a DS webinar (link bellow) about Raw Materials. It is apparently possible to automate the Make From relation transfer into MBOM. Make From relation with Raw Material created in XEN was automatically transferred into MFN and Continuous Provided Material was automatically generated when Mfg Item was created (44:20 in a video). But for some reason I can’t make it work. When drag and dropping the 3DPart into Manufacturing Items side, Provided Part is created without any Continuous Provided Material. Does anyone have an idea, what the problem might be here?
Webinar:
https://www.youtube.com/watch?v=-uvhAZeeneE
