Hi everyone,
I am working on a Manufacturing Simulation and have a question regarding Assembly Sequence management, specifically within the Gantt chart view.
When I drag and drop or import multiple tracks (e.g., 20 tracks) into the Assembly Sequence Gantt chart, they are automatically arranged in a linear, sequential order (steps 1 through 20). However, I need all of these tracks to execute simultaneously at the same sequence/start time.
Currently, I have to manually drag and align each track block one by one within the Gantt chart to make them concurrent, which is highly time-consuming.
Is there a built-in shortcut, setting, or batch-selection method to snap/align all inserted tracks to the same sequence at once?
Any advice would be greatly appreciated. Thanks!
AS-IS
TO-BE