Dear all,
Could somebody explain the added value of the Manufacturing Requirements usage (generated from FTA stored on the 3DMaster model) in the Planning downlstream processes (MBOM . Planning(Routing) and WorkInstructions)?
I do not get the value of manual assignement of the Manufacturing Requirements to the MBOM, filtering and assignment to the Operation based on the scope link between the MBOM item and General system (collection of operation).
The process is exemplified in the DELMIA Part Fabrication demo available in the Experience Center in 3DEXPERIENCE 2020x.
The scope is only to make the Manufacturing Requirements available on the Work Instruction level?
Can somebody provide me more info on this topic.
Thanks in advance!