Disclaimer:
I don't have CAD experience and little documentation experience.I'm an IT guy, so my perspective is a bit different than most you.
I find the version & revision referencing a little confusing.For instance, using the out-of-the-box default workflow and it'srevisioning scheme, I have a SWPart that is showing M-13 on the"Contains" tab Version field, but in the below window it shows17/17 in the version column.
I know that the "17" increments anytime the file is checked out andback in, and the M-13 increments when the file runs through theworkflow, but what is the proper way to look at these two differentnumbers to avoid confusion?
- jasonSolidworksSolidworks Pdm enterprise Pdm
I don't have CAD experience and little documentation experience.I'm an IT guy, so my perspective is a bit different than most you.
I find the version & revision referencing a little confusing.For instance, using the out-of-the-box default workflow and it'srevisioning scheme, I have a SWPart that is showing M-13 on the"Contains" tab Version field, but in the below window it shows17/17 in the version column.
I know that the "17" increments anytime the file is checked out andback in, and the M-13 increments when the file runs through theworkflow, but what is the proper way to look at these two differentnumbers to avoid confusion?
- jasonSolidworksSolidworks Pdm enterprise Pdm