updating revision table when replacing drawing

Hi,

I have a drawing in the vault with a revision table with somerevisions.
I received a drawing from a supplier, and a want to put it in thevault with the same name, but as a new revision.

How can I put it in the vault, with the older revisions beingshowed in the (new) rev table?SolidworksWorkgroup Pdm