Updating a drawing.

There are so many changes I'm doing to one drawing. Can I change a drawing number and start a new revision or use the same drawing number with revision E? If I go with the same drawing number, then I have to record all the changes I did on the ECR. This will take me a lot of hours to do. So is it better to just assign a new drawing number and will ASME guidelines allow me to do that?