Solidworks Costing for Structure System

Can anyone know why there are differences between Weldment and Structure System when I am trying to do cost estimation using Solidworks costing? In Weldment, multibody parts are defined as Structural Bodies. While in Structure System, the multibody parts is defined as General Bodies. Any idea how to change this to Structural Bodies?