I have two different assemblies, they both shareparts/sub-assemblies. I have made the drawings for one assembly andstarting on the second, is it possible to grab drawings that I'vefinished already and insert them into the new batch of drawings?
Please let me know if it's possible, this would save me about aday's work per assembly 'cause I'm sure we all know what it meanswhen the boss says "git r done".SolidworksDrawings And Detailing
Please let me know if it's possible, this would save me about aday's work per assembly 'cause I'm sure we all know what it meanswhen the boss says "git r done".SolidworksDrawings And Detailing