Not sure if I'm being dumb or having SW09 Problems.
When I use an equation between two dimensions the part that Ichange will update but the second part will not unless i open theEquations, click ok, then rebuild. Anybody know if this is an issuewithin 09?
Also, I can't get the coordinate system to view its left and rightscorrectly, If I build a cube and label it on all 6 sides the leftand right are still reversed, if you try to update your views itturns it upside down so now the top is the bottom.
I'm only about a year into SW but I don't remember having theseproblems in 08.
Thanks, ChrisSolidworksGeneral
When I use an equation between two dimensions the part that Ichange will update but the second part will not unless i open theEquations, click ok, then rebuild. Anybody know if this is an issuewithin 09?
Also, I can't get the coordinate system to view its left and rightscorrectly, If I build a cube and label it on all 6 sides the leftand right are still reversed, if you try to update your views itturns it upside down so now the top is the bottom.
I'm only about a year into SW but I don't remember having theseproblems in 08.
Thanks, ChrisSolidworksGeneral
