I have create a harness around a hinge. The route includestwo clips on either side of the hinge, and multiple-point splinebetween the clips.
The harness model was originally created with the door in an openedposition. Closing the door to zero-degrees causes the originalsketch to fail. However, closing the door 5-degrees at a timeworks, but only to 50 degrees of being closed. Closing beyond acertain angle causes the sketch to fail.
Any best practices?SolidworksRouting
The harness model was originally created with the door in an openedposition. Closing the door to zero-degrees causes the originalsketch to fail. However, closing the door 5-degrees at a timeworks, but only to 50 degrees of being closed. Closing beyond acertain angle causes the sketch to fail.
Any best practices?SolidworksRouting
