I'm working on setting up PDMWorks and thought everything wasOK, but I encountered a problem with the REV Tables on somedrawings.
During 'check in' the correct REV level was set, and "Initial checkin" was entered in to the 'Description' field. Some drawing had anew row added to the REV table with this information filled in(+the correct date too). Several though had the bottom row editedand the 'Description' field was overwritten with "Initial check in"(without the correct date).
I checked the Vault Settings and the 'Number of visible rows' isset to 10, but none of the effected files had more than 5 rows inthe table.
Any ideas about what's going on?
Thanks,
JoshSolidworksWorkgroup Pdm
During 'check in' the correct REV level was set, and "Initial checkin" was entered in to the 'Description' field. Some drawing had anew row added to the REV table with this information filled in(+the correct date too). Several though had the bottom row editedand the 'Description' field was overwritten with "Initial check in"(without the correct date).
I checked the Vault Settings and the 'Number of visible rows' isset to 10, but none of the effected files had more than 5 rows inthe table.
Any ideas about what's going on?
Thanks,
JoshSolidworksWorkgroup Pdm