Ok We are using the lifecycle and revision control on ourdocuments and it almost works!!! lol
We have a revision status "0-99", lifecycle status called,"WIP"
We have a revision status "A-Z", lifecycle status called,"released"
So When I check-in a document and change to "released", therevision changes from a number(s), to a letter, "A"
This works fine.
What does not work, is the revision change to the letter "A", if Ichange the lifecycle whilst the document is in the vault.
Quite often, (due to the skill of the workers here, :-P, lol), wedo not need to check-out and then check-in again as a smalllproject will work first time.
Is there a way of updating the revision automatically in the vault,when the lifecycle is updated??
Clear as mud???, lol
SolidworksWorkgroup Pdm
We have a revision status "0-99", lifecycle status called,"WIP"
We have a revision status "A-Z", lifecycle status called,"released"
So When I check-in a document and change to "released", therevision changes from a number(s), to a letter, "A"
This works fine.
What does not work, is the revision change to the letter "A", if Ichange the lifecycle whilst the document is in the vault.
Quite often, (due to the skill of the workers here, :-P, lol), wedo not need to check-out and then check-in again as a smalllproject will work first time.
Is there a way of updating the revision automatically in the vault,when the lifecycle is updated??
Clear as mud???, lol
SolidworksWorkgroup Pdm
