One of the groups I have set up cannot get the latestrevision of asolidworks file. They are in the Purchasing groupwhich hasRead-Only rights to any completed drawings and I am intheEngineering group which has Read-Write rights to anycompleteddrawing. This particular drawing has been completed,revised toRev.B and is in the correct Lifecycle stage. Whenthepurchaser searches for this drawing, Rev.A shows upautomaticallyand they can only open a copy of Rev.A. I have checkedthat theoptions on their computer has "Latest Revision"selected.When I or anyone from the Engineering group searches forthisdrawing, Rev.B is automatically selected and they can open acopyof Rev.B. This has caused a huge problem because the Purchasersenta copy of Rev.A to the supplier to make becasue up until now,thenewest revision has always automatically shown up. Please help.
Update: After looking at this particular file closely, Ifound outthat it was in a different Lifecycle Status than what wasshown onthe screen. I have the labels set to display theRevision,Owner & Lifecycle Status. The status label was showingthewrong status. Has anyone ever encountered this?SolidworksWorkgroup Pdm
Update: After looking at this particular file closely, Ifound outthat it was in a different Lifecycle Status than what wasshown onthe screen. I have the labels set to display theRevision,Owner & Lifecycle Status. The status label was showingthewrong status. Has anyone ever encountered this?SolidworksWorkgroup Pdm