I need to "take down" a replicated pdmwe site, something Ihave never done so I am hoping someone here can confirm the steps Ihave noted below on how to do this. This is just a basic outline ofthe steps that need to be taken and the sequence, I realize thateach of these steps will need to be broken down into smalltersteps.
1) All users should confirm that no documents are checked out, alldocuments should be checked in
2) Uninstall the clients to prevent additional data manipulationand delete local files.
3) Force last replication to master to create final data capture offile vault
4) Stop scheduled replication
5) Delete file vault, choose option to delete local cache of files
6) Uninstall archive server
Anything else???
Thanks....SolidworksSolidworks Pdm enterprise Pdm
1) All users should confirm that no documents are checked out, alldocuments should be checked in
2) Uninstall the clients to prevent additional data manipulationand delete local files.
3) Force last replication to master to create final data capture offile vault
4) Stop scheduled replication
5) Delete file vault, choose option to delete local cache of files
6) Uninstall archive server
Anything else???
Thanks....SolidworksSolidworks Pdm enterprise Pdm