How to switch Workflow

Hi All, I have a part, which is in the default workflow(RevisionManaged).
What I want, is to change the Revision Controlled SW-part toaNon-Revision-Managed part (Standard part).

Is this possible?
I think I have to switch workflow.
Is this true?
How can I do this?
Or is there another (more easy) way?
Thanks in advance, Rene Daanen HollandSolidworksSolidworks Pdm enterprise Pdm