Hi,
As an ongoing thing we're converting files from 2D into 3D as we need to work on them. We're in injection molding BTW. Sometimes we'll need to update only certain parts of a tool so then only that detail will get modeled. The assembly will be created in 3D and all components will be placed where they should be etc. but the assembly will of course not be complete as many components still live in 2D land.
When creating the BOM in the SW drawing I thought I could "edit" the SW item no. to match that of the 2D BOM so that everything syncs up. When I do this it always seems to change on me, at what point it does so I'm not sure (e.g. drawing saved, rebuilt assy, drawing opened). My workaround is to add a custom prop to all components for ITEM NO. and use that in the BOM. Any other suggestions or comments? Has anyone had any serious drawbacks on using a method such as this to convert 2D to 3D using this "as needed basis" method?
SolidworksDrawings And Detailing
A very quick, down and dirty, trick might be to save the 2D information as an image and simply insert it into the SW drawing.
But, you should be able to manipulate the SW BOM to show the same data as the 2D version.
A longer term alternative is to create a set of dummy (empty) components in a SW assy, and arrange them to suit the 2D BOM.
SW Labs has a product called Treehouse which would be perfect for this. http://labs.solidworks.com/Products/Product.aspx?name=treehouse
When time comes to create the 3D parts, the geometry can be created in the dummy parts.