We are currently running drop test studies. 1 Analysis willtake at least 170 hours to complete. We had power failures in thenight longer than our UPS can handle.
Is there any way that we can save or capture the run process sothat we can start the anlysis from there if the power fails again.
SolidworksSimulation
Is there any way that we can save or capture the run process sothat we can start the anlysis from there if the power fails again.
SolidworksSimulation
