2008 top down and pdmwe

If I'm working with a top-down concept inside an assembly Icannot use a model with a serial number created from theadministration tool because PDMWE doesn't intercept the "Insert newpart" event.
What does it mean ? Is the PDMWE the end of top down projects?SolidworksSolidworks Pdm enterprise Pdm