Defining Time Parameters Using Statistical Distributions in Production Simulation Scenarios

Hello Community,

 

In production simulation scenarios, is it possible to define time parameters like cycle time using statistical distributions instead of fixed values ? 

 

For example, can the operator’s cycle time be defined with a Normal distribution (mean = 5 minutes, standard deviation = 1 minute) or a Uniform distribution (between 4.5 and 5.5 minutes) ?