Hello Community,
In production simulation scenarios, is it possible to define time parameters like cycle time using statistical distributions instead of fixed values ?
For example, can the operator’s cycle time be defined with a Normal distribution (mean = 5 minutes, standard deviation = 1 minute) or a Uniform distribution (between 4.5 and 5.5 minutes) ?