Maximize Net Present Value (NPV) by creating and evaluating multiple scenarios for optimized pit and pushback phases as well as mining schedules.
The Pit Optimizer is a platform-based Strategic Mine Planning tool used by mining engineers to generate pit and pushback optimizations as well as schedules for surface mines. It allows a user to define solutions that maximize the Net Present Value (NPV) and to evaluate optionality in multiple optimized pushback and scheduling scenarios.
Benefits
- Define and evaluate multiple pit optimization and scheduling scenarios with different sets of input parameters
- Select optimal mining and processing strategy for surface mines through determination of Ultimate Pit and Practical Pushback Phases
- Generate realistic mine plans and schedules by applying practical mining constraints like minimum mining width and mining direction
- Streamline workflow and enable 3DEXPERIENCE platform integration through exposing and accessing parameters stored in block models
Highlights
- Multi-scenario definition of technical and economics parameters
- Optimized pit and pushback generation
- Basic Life of Mine per-period scheduling
- Practical constraints definition
- Visualization of optimization and scheduling outputs
- Report generation and results analytics (tabulation and graphs)
- Generate output that can be consumed downstream
What's New
- Improved definition and flexibility of exclusion zones using geoscience filters, and conditional removal at a user-specified cost
- Improved interpretation of optimization results via enhanced reporting for economics and scheduling results
- Improved scenario analysis capability, enabling the iterative simulation of scenarios
