I would like to make this worker centralized on the line responsible for supplying the 4 assembly cells of my manufacturing line. However, I was not able to combine the movement of the worker with the cart, which would transport all the material to the cells.
Can you help me by giving me a detailed step-by-step guide on how to combine these movements? I've already watched the factory flow simulation tutorials, but they didn't help me in this step