Scenario 1:
How can we simulate or feed the following activities into the simulation?
- Before starting production, machines should be switched on by the respective personnel.
- Material data preparation for production by the designated personnel.
- Logging into email to send the daily production plan.
- Machine cleaning by the respective operators.
- Material inspection and weighing before starting production.
Scenario 2:
- After the machining process, weighing the material and inspecting its quality.
- Switching off the machines after completing the machining operation and recording the data.
Can these types of real-time pre-production and post-production activities be simulated in Factory Flow Simulation?
If not, will their absence affect the manpower utilization statistics generated in the simulation report?