How to batch-align multiple Tracks to the same sequence in the Gantt Chart?

Hi everyone,

I am working on a Manufacturing Simulation and have a question regarding Assembly Sequence management, specifically within the Gantt chart view.

When I drag and drop or import multiple tracks (e.g., 20 tracks) into the Assembly Sequence Gantt chart, they are automatically arranged in a linear, sequential order (steps 1 through 20). However, I need all of these tracks to execute simultaneously at the same sequence/start time.

Currently, I have to manually drag and align each track block one by one within the Gantt chart to make them concurrent, which is highly time-consuming.

Is there a built-in shortcut, setting, or batch-selection method to snap/align all inserted tracks to the same sequence at once?

Any advice would be greatly appreciated. Thanks!

AS-IS

 

TO-BE