Dear MS Community,
- I performed a 500 ps NPT run in Materials Studio to equilibrate the system, followed by a 5000 ps NVT production run. For the production run, I used the 
.xtdfile generated from the 500 ps equilibration and appended the two trajectories using the Restart option. As a result, both trajectories are now combined into a single.xtdfile. Is there a way to separate them back into individual trajectories? - Additionally, suppose I have a trajectory file of 100 ns, but I want to analyze the RDFs only for the last 20 ns. Could you please suggest how to extract just the final 20 ns (and make it a new trajectory file) from the 100 ns trajectory file?
 
Thanks in advance.